Street improvement Project Updates

FOR City of Jenks PROJECT UPDATES, PLEASE OPT INTO OUR Notification system.

106TH STREET EXTENSION (ELM STREET TO LEWIS AVENUE) Design

Funded through 2020 G.O. Bond Issue

UPDATE (08/10/2022) -  Survey work is currently in progress and should be completed in September 2022.


traffic signal upgrade - COMPLETED

UPDATE (01/18/2023) - The contractor has completed upgrading all intersections and this project is complete. 

UPDATE (10/05/2022) -  The contractor expects all equipment for this project to be delivered by mid-November and construction to start in early December 2022. 

UPDATE (08/10/2022) - Staff has advertised this project and bids were opened on August 9, 2022.



Elwood avenue improvement (Main street to 111th street)

Funded through 2013 G.O. Bond Issue and ODOT Project JP30160

Project Overview: This project will construct an improved 2-lane street with shoulders between Main Street and 111th Street and add a trail on the east side of the roadway.  

UPDATE (10/05/2022) - Oklahoma Turnpike Authority will submit the right-of-way acquisition documents to their Board for approval on 10/25/2022.

UPDATE (08/10/2022) - The survey has begun and geotechnical field services are complete.

UPDATE (06/05/2022)- The design is 90% complete and most of the right-of-way has been acquired.


ELWOOD AVENUE IMPROVEMENT (91ST TO 96TH STREET)


UPDATE  (10/18/2023) - Staff has provided review comments to the consultant on the preliminary design drawings.



Main Street improvement (Date Street east to TSU Railroad)

Funded through 2020 G.O. Bond Issue and ODOT Project JP31550 

Project Overview: The concept of this project is to improve the existing 3-lane configuration of Main Street and add curbing, drainage and landscaping to this portion of downtown.  In addition, Birch Street will be improved with a sidewalk, curbing and storm sewer from Main Street to Veterans Park Drive.  

UPDATE (08/10/2022) - Staff working with ODOT and the design consultant to modify plans in the area southeast of Main Street and Birch Street.  Staff will seek to remove some improvements from the City project that the prospective developer of this area will install as part of their project.

UPDATE (06/05/2022)- The design is nearing 100% complete, most of the right-of-way has been acquired and utility relocation should begin June 16th (weather permitting).



south Elm Street improvement (111th Street to 131st Street)

Project Overview: The concept of this project is to expand Elm Street to 5 lanes from 111th Street to approximately 125th Street South and transition to 3 lanes to 131st Street.  A pedestrian trail will be included along with the 5-lane segment.

UPDATE (10/05/2022)  - Consultant has submitted Final Plans for review.

UPDATE (06/05/2022) - Right-of-way acquisition is underway and utility relocation plans are being coordinated with the design engineers and the utility companies.  Consultant to modify roadway alignment on the south mile of the project by moving it west between the two intersections at 121st Street and 131st Street.  ONG has begun utility relocation on the north mile.  AT&T will conduct their relocation which will only be in the south mile once right-of-way has been acquired.  



1st street improvement (Aquarium place to aquarium drive)

Funded through Jenks Vision Funds

Project Overview: Engineering design has been initiated to construct street and drainage improvements on 1st Street from Aquarium Place south to Aquarium Drive.

UPDATE (10/05/2022)  - The pre-work meeting for overlay project will be 10/13/2022 and the Notice to Proceed date for construction will be 10/24/2022.

UPDATE (08/10/2022) - Staff has advertised the overlay project for bidding and bids will be opened on August 16, 2022.

UPDATE (06/05/2022): Staff began design work for a mill and overlay on 1st Street from Aquarium Place to Aquarium Drive.





7th STREET IMPROVEMENT (AQUARIUM PLACE TO AQUARIUM DRIVE)

Funded through Jenks Vision Funds

Project Overview: Engineering design has been initiated to construct street, sidewalk, and drainage improvements on 7th Street from Aquarium Place south to Aquarium Drive.

UPDATE (10/05/2022) - The pre-work meeting for overlay project and the Notice to Proceed construction date will be 10/07/2022.

UPDATE (08/10/2022)- Staff has advertised the overlay project for bidding and bids will be opened on August 19, 2022.

UPDATE (06/05/2022): Staff began design work for a mill and overlay on 7th Street from Aquarium Place to Aquarium Drive.



121st Street Overlay project (elwood avenue to elm street) - COMPLETED

Project Overview: 121st Street, from Elwood to Elm, had 2 inches of asphalt overlay applied and new paint striping.

UPDATE (06/05/2022) - The Contractor completed the mill and overlay, along with paint striping, at the end of April 2022.



aquarium place mill and overlay project (elm street to aquarium drive)

Federally Funded Under the Coronavirus Response and Relief Supplemental Appropriations Act

Project Overview: This  project will consist of milling and overlaying 2 inches of asphalt on Aquarium Place and widen the intersection at Elm Street.

UPDATE - (01/18/2023) - Staff has submitted 90% plans to ODOT and waiting for ODOT to schedule review meeting.

UPDATE (06/05/2022) - Once the recently obtained survey has been incorporated into the design, a review meeting will be set up with ODOT.

 

fox run pavement repair 


UPDATE (01/18/2023) - The contractor has completed some of the concrete for the patches on 115th Street and 114th Court.    

UPDATE (10/05/2022) - The concrete pavement repair project for Fun Run Addition will be advertised on 10/07/2022 and bids will be opened on 10/08/2022.


slate creek, wood lake, country woods, country woods ii, country hollow, southwoods pavement improvements


UPDATE (01/18/2023) - The pavement rehabilitation project for the six additions listed above will be advertised for bidding on January 27th.