101ST STREET (ELM STREET TO BARKWEST TRAIL)
UPDATE (05/30/2023) - Paving of asphalt is complete. Landscaping and fence replacement should begin this week.
121ST STREET TRAIL (ELM TO ELWOOD)
UPDATE (06/20/2023) - Staff is going through the design consultant selection process.
PEDESTRIAN BRIDGE INSPECTION
UPDATE (06/20/2023) -
Concerning the Bridge Inspection Report:
o The consultant is reviewing inspection data and photos, the draft report is in-progress, the draft report is preparing for the first round of quality control review.
• Concerning the Load Rating Analysis:
o The Base/Design As built with current dead loads model is complete, the first round of quality control on the base model is underway.
• The draft inspection report is due in June, the load rating analysis is due in September and the final bridge inspection report is due in October.