What is the summary of required inspections?
  • Indoor in-ground safe rooms:
    Post-tension hardware inspection (if applicable) before pouring new concrete.
  • Outdoor in-ground shelters:
    Site inspection after excavation but before placement of shelter.
  • Outdoor above-ground shelters:
    Site inspection before placement of shelter.

ƒInspection of any new foundation (if applicable) before pouring new concrete.


Show All Answers

1. Which types of safe rooms and storm shelters require a permit?
2. Does the City of Jenks allow storm shelters and safe rooms to be installed for residential purposes?
3. Can I have a safe room installed in the floor of my existing home in a garage, closet, etc.?
4. Who acquires the permit?
5. How long does it take to get a permit?
6. Where do I get a permit application?
7. Why does the permit application require a site plan?
8. What if I don’t know all this information that the permit requests?
9. What inspections are required during the installation of my storm shelter or safe room?
10. Who calls in the inspection?
11. Why are inspections needed?
12. What else should I do when having a shelter or safe room installed?
13. What is the summary of required inspections?